SeaQuiz

The main turbine gland sealing system is designed to __________.

  1. Aseal the turbine shaft against air leakage into the turbine casing
  2. Ballow minimal steam leakage out of the gland
  3. Cregulate steam pressure to the glands when the main turbine is operating at reduced speeds
  4. Dall of the above ✓

Correct answer: D) all of the above

USCG question bank (2008) · Steam Plants – Question Bank Book 13 · pass mark 70%

← PreviousNext →
Take the full practice test: Steam Plants – Question Bank Book 13 →Free USCG practice test with the real pass mark, no sign-up

More questions from this module

Question list: Steam Plants – Question Bank Book 13 (BK13)