Coast Guard Regulations (46 CFR) require that main steam piping must be hydrostatically tested at specified intervals. If the pipe insulation cannot be removed during this test, the piping shall be tested at __________.
- A1 1/4 times the maximum allowable working pressure and the pressure maintained for 10 minutes ✓
- B1 1/2 times the maximum allowable working pressure and the pressure maintained for 20 minutes
- Coperating pressure and temperature and the pressure maintained for 1 hour
- Da pressure and temperature specified by a Coast Guard marine inspector
Correct answer: A) 1 1/4 times the maximum allowable working pressure and the pressure maintained for 10 minutes