The designed 'end point for combustion' for a boiler furnace is reached when __________.
- Athe amount of heat being transferred to the tubes reaches a maximum no matter how much the firing rate is increased
- Bpanting of the furnace accompanied with black smoke takes place
- Cthe maximum rate the boiler can generate steam is reached
- Dthe boiler is operating at its maximum fuel oil firing rate ✓
Correct answer: D) the boiler is operating at its maximum fuel oil firing rate