SeaQuiz

Where should the "Damage Control Plan", required by SOLAS, ch. II-1, be located and who should be familiar with it?

  1. ANeed to be exposed on the bridge and in the machinery space to be accessible to all members of the crew.
  2. BThere should be a manual containing the information to combat flooding accessible to the Master and Chief Engineer.
  3. CNeed to be exposed or easily accessible on the bridge, as well as to have a guide containing the information of the plan available to all officers. ✓
  4. DNeed to be exposed to the bridge and accessible to the Master and deck officers.

Correct answer: C) Need to be exposed or easily accessible on the bridge, as well as to have a guide containing the information of the plan available to all officers.

← PreviousNext →
Take the full test: F3 Controlling the Operation — Operational Level (OOW) →Random exam test generator, free, no registration

More questions from this test

Question list: F3 Controlling the Operation — Operational Level (OOW)