Energy Efficiency Design Index is calculated for
- Aships with a tonnage GT< 400 engaged in international voyages.
- B"new passenger ship" within the meaning of annex IV of MARPOL 73/78.
- Cships with a tonnage > 100 GT, engaged in international voyages.
- D"new ship" as defined in the revised Annex VI to MARPOL 73/78. ✓
Correct answer: D) "new ship" as defined in the revised Annex VI to MARPOL 73/78.