SeaQuiz

According to SOLAS V/22 " Navigation Bridge Visibility " forward visibility must not be limited by the deck load to

  1. A200 m or two ship lengths Loa.
  2. B400 m or two ship lengths Loa.
  3. C300 m or two ship lengths Loa.
  4. D500 m or two ship lengths Loa whichever is the less ✓

Correct answer: D) 500 m or two ship lengths Loa whichever is the less

← PreviousNext →
Take the full test: F2 Cargo Handling — Management Level →Random exam test generator, free, no registration

More questions from this test

Question list: F2 Cargo Handling — Management Level