SeaQuiz

In preparation, for unloading the ship, should be checked

  1. Athe temperature of the water and the air.
  2. Bthe depth of the water.
  3. Cwork on the ballast system only.
  4. Dthe working condition of the ballast pumps and valves, hatch covers and loading devices. ✓

Correct answer: D) the working condition of the ballast pumps and valves, hatch covers and loading devices.

← PreviousNext →
Take the full test: F2 Cargo Handling — Management Level →Random exam test generator, free, no registration

More questions from this test

Question list: F2 Cargo Handling — Management Level