SeaQuiz

The ship loads calculated quantity to summer waterline – 10 m, on even keel with density 1.025. At the end of loading measured draughts of bow and stern are in 9.92 m and on the middle 10.02 m. Is there a violation on ICLL?

  1. AThe summer load line is submerged with 2 cm which is violation of ICLL. No allowance is made for the vessel being sagged. ✓
  2. BThe summer load line is submerged with only 2 cm and that can be ignored.
  3. CTo avoid infringement we should calculate how much load to move from the edges to the middle to remove the deflection (sagging).
  4. DThere is no violation, but on SOLAS only, because the SOLAS II-1/5-1 requires the draught scales just fore and aft. I.e. the draught is 9, 92m.

Correct answer: A) The summer load line is submerged with 2 cm which is violation of ICLL. No allowance is made for the vessel being sagged.

← PreviousNext →
Take the full test: F2 Cargo Handling — Management Level →Random exam test generator, free, no registration

More questions from this test

Question list: F2 Cargo Handling — Management Level