SeaQuiz

Why are most break bulk vessels built with the transverse framing system rather than the longitudinal system?

  1. AThe transverse system is more resistant to hog and sag stresses.
  2. BThe numerous longitudinal frames cause excessive broken stowage.
  3. CThe transverse system provides better support to the varying cargo densities on a break bulk vessel.
  4. DThe longitudinal system is not suitable for the stowage of general cargo. ✓

Correct answer: D) The longitudinal system is not suitable for the stowage of general cargo.

← PreviousNext →
Take the full test: F2 Cargo Handling — Management Level →Random exam test generator, free, no registration

More questions from this test

Question list: F2 Cargo Handling — Management Level