SeaQuiz

The full technical speed of the ship is developed:

  1. Awith maximum permissible load on the power plant
  2. Bin an emergency load of the power plant
  3. Conly with a following wind
  4. Dat nominal allowable load of the power plant ✓

Correct answer: D) at nominal allowable load of the power plant

← PreviousNext →
Take the full test: F1 Navigation — Management Level (Master / Chief Mate) →Random exam test generator, free, no registration

More questions from this test

Question list: F1 Navigation — Management Level (Master / Chief Mate)