Communication of a PLC – Client in an Industrial Ethernet network using an S7_Connection protocol requires:

  1. Asetting the CP communication module and the data exchange software,
  2. Bsetting the communication module and indicating the address and the memory area of the partner station,
  3. Csetting the CP module, setting the “Connection” and the data exchange software. ✓

Correct answer: C) setting the CP module, setting the “Connection” and the data exchange software.

← PreviousNext →
Take the full test: F1 Electrical, electronic and control engineering — ETO (CMKE, Poland) →Random exam test generator, free, no registration